Currently Open Recommendations
| P-11-09 | Immediate 911 Notifications; UCL | Sep 26, 2011 |
| P-11-12 | Eliminating Operator Discretion; UCL | Sep 26, 2011 |
| P-11-14 | Eliminating Grandfather Clause; UCL | Sep 26, 2011 |
| P-11-13 | Post Accident Drug & Alcohol Testing; UCL | Sep 26, 2011 |
| P-11-16 | Assist with California PUC Audit; UCL | Sep 26, 2011 |
| P-11-15 | Post-Construction Hydrostatic Pressure Test; UCL | Sep 26, 2011 |
| P-11-10 | Equipping SCADA Systems; UCL | Sep 26, 2011 |
| P-11-19 | Assessing Effectiveness; UCL | Sep 26, 2011 |
| P-11-11 | Installing ACVs or RCVs; UCL | Sep 26, 2011 |
| P-11-18 | Revision of Integrity Management Protocol; UCL | Sep 26, 2011 |
| P-11-17 | Requiring In-line Inspection Tools; UCL | Sep 26, 2011 |
| P-11-20 | Meaningful Metrics; UCL | Sep 26, 2011 |
| P-11-08 | Providing System-Specific Information; UCL | Sep 26, 2011 |
| P-09-01 | Electric Resistance Welded (ERW) Pipe Study; OAR | Oct 27, 2009 |
| P-09-02 | ERW Study Implementation; OAR | Oct 27, 2009 |
| P-04-01 | Cohasset - Pipeline Integrity; OAR | Jul 1, 2004 |
| P-04-03 | Cohasset - Pipeline Integrity; OAR | Jul 1, 2004 |
| P-01-02 | South Riding - Pipeline Technology (Excess Flow Valves); OAR | Jun 22, 2001 |
![[Header] PHMSA - U.S. Department of Transportation - Pipeline and Hazardous materials Safety Adminis](/staticfiles/PHMSA/SiteHeaders/Images/PHMSASiteHeader.gif)

